|
September 19, 2006
the Trailer belonging a civil engineering firm "Bridge", transported a heavy dredge. Passing under the railway bridge in area of 224-th kilometer , the driver has not managed to correlate the sizes of a cargo with height of the bridge and has hooked ...
|