|
December 03, 2006
According to IA REGNUM. At 14.04 the damaged transmission line has been restored, stage-by-stage connection of consumers of the electric power has begun. As earlier it was informed, as a result of breakage in area Buinaksk a high-voltage line ยท 118 the part of mountain and high-mountainous areas of Republic Dagestan has been disconnected.
|